Sign In
We'll never share your email with anyone else.
Reset Password

Enter your email address and we'll send you a link to reset your password.

Back to Sign In

Japan Railway Journal Season 9 Episode 4 The Tohoku Shinkansen: Full Speed Ahead 2023

JR East is working to reduce travel times by increasing the speed of the Tohoku Shinkansen to attract tourists and revitalize the region. The company is currently conducting tests using its test vehicle, the ALFA-X. They aim to realize a commercial operation with a maximum speed of 360 km/h by developing new rolling stock as well as supporting infrastructure. With the extension of the Tohoku-Hokkaido Shinkansen scheduled to open in the spring of 2031, the company is looking to compete with the airlines, which see around 10 million passengers per year. See the latest developments of the ALFA-X, as well as environmental measures to reduce noise pollution along the line.

Download : MKV
Download : MP4

Similars

Recommendations